HRSA Claremont Station Project

HRSA Claremont Station Project

June 24, 2022

Our Holland Rail Services Australia team has been hard at work throughout Western Australia with a number of projects. See our recent project on Claremont Station below to learn more about how HRSA was able to help with a solution.

The Situation:

The Claremont station project was part of the Public Transport Authority network on the Fremantle train line in Western Australia. This project was an important part of the Metronet package to improve passenger experience at the station, increase service frequency and allow direct access to the Forrestfield-Airport Link. New 50kg One Steel rail was required to upgrade the Up and Down main of the Fremantle train line along with the installation of two new turnback facilities.

 

The Challenge:

New 50kg One Steel rail was required to upgrade the Up and Down main of the Fremantle train line along with the addition of two new turnback facilities. 27.5m 50Kg One Steel Short Rails were required to be welded into 110m Long Welded Rails. Space constraints meant Flashbutt welding sequence and footprint considerations was imperative to successful completion of welding.

The Solution:

HRSA utilised its Portable Plant 80 welder to reduce the total space required to complete Flashbutt welding works. This included HRSA’s speciality lifting frame and alignment bed. HRSA’s proprietary Intelliweld® system was utilised on the Portable Plant Welder to record and monitor every weld. Automatically generated production reports were created which allowed ease of tracking and identification of all welds completed along with timely submission to client for review. Over 140+ welds were completed ahead of forecasted time. Additional welds were able to be completed to create LWR’s for work outside of original scope due to the initial works being completed ahead of time. All welds were compliant to PTA network specifications. Successful completion of HRSA’s first project in Australia. Most importantly all work was completed safely with all team members returning home safe every day.