images
Up one level- TrackSTAR on-track
- TrackSTAR on-track
- Typical Strip Chart
- Example of a typical strip chart
- Profile Overlays, Multiple Runs
- Example of profile overlays
- Load Axle and Sensor Beam
- Load axle and sensor beam
- Figure #3 Scheduled Change-out 2-Up
- Figure #3 Scheduled change-out with 2-Up display window
- Figure # 1 Rail Replacement Forcast
- Calculates rail wear rates by time or tonnage and projects the dates at which each rail segment (curves and tangent segments) will meet the railway’s unique rail wear limits.
- Figure # 2 Visual Rail Replacement Plan
- Visual Rail Replacement plan allows planners to cross reference the data by double clicking on the wear charts to obtain a “two-up” profile window which shows the current and historical wear at any given location
- Figure 4. Rail Wear Trend charts show when rail will each near condemning limits.
- Query the database to identify rail that has reached or is approaching its replacement limits, based on the rail section, historical wear and the railway’s replacement criteria.
- Header, Techline Newsletter
- Header, Techline Newsletter